Skip to main content

Table 4 Total contribution ratio of variance

From: Evaluation and future framework of green mine construction in China based on the DPSIR model

Values

Description

Component

Y1

Y2

Y3

Initial eigenvalue

Total

11.2

1.5

0.5

Percentage of variance

84.5

11.4

4.1

Cumulative percentage

84.5

95.9

100

Loaded values of extracted quadratic sum

Total

11.2

1.5

 

Percentage of variance

84.5

11.4

 

Cumulative percentage

84.5

95.9