Skip to main content

Table 5 Principal component load matrix of green mine construction

From: Evaluation and future framework of green mine construction in China based on the DPSIR model

Influencing factors

Principal components

Y1

Y2

D1

0.416

−0.123

D2

0.795

0.284*

P1

−0.519

−0.051

P2

−0.908*

−0.060

P3

−0.779

0.127

P4

−0.911*

0.455*

S1

0.571

0.123

S2

0.444

−0.094

S3

0.971*

0.218

S4

0.179

−0.147

S5

0.426

0.282*

S6

0.367

0.074

I1

0.819*

0.200

I2

−1.332*

0.154

R1

0.275

0.912*

R2

0.618

−0.246

R3

0.975*

0.001

R4

0.934*

0.095

R5

0.821*

0.077

R6

0.792

0.173

  1. *Strong loading weight