Fig. 10From: Recovery of cobalt and copper from single- and co-contaminated simulated electroplating wastewater via carbonate and hydroxide precipitationSludge volume at 30 min and sludge settling rate at different [P]/[M] ratio for cobalt (a, b) and copper (c, d) using different precipitantsBack to article page