Skip to main content

Table 4 Summary of operating conditions and costs of EC compared to conventional treatment methods

From: Techno-economic evaluation of electrocoagulation for cattle slaughterhouse wastewater treatment using aluminum electrodes in batch and continuous experiment

Parameter

Unit

Current EC study

Similar EC studies

[3, 23, 31,32,33, 37,38,39,40,41]

Conventional Treatment methods [4, 34, 42, 43]

HRT

h

1

1–1.5

3–20

CD

mA cm−2

4

2–30

Aluminum electrodes consumption

kg m−3

0.6

0.4–1.5

Energy consumption

kWh m−3

0.876

0.7–20

2.5–95

Sludge volume produced

L m−3

68

80–350

Sludge weight (as TS)

kg m−3

1.15

0.96–1.78

2.8–3.9

Sludge organic matter content (as VS)

%

78

60–80

Total Operating cost

USD m−3

1.5

1.2–2.5

2.6–8.5